Fibre Cabling of the first ROD | |||||||||||||||||||||||||
The Analogue
Optohybrids (AOH) were cabled in place on the ROD for the first time on
26 February 2002. This page contains some images of before and after the
process. (Click on an image to enlarge it) Positioning of Optohybrids relative to the structure and description of their fibre labelling is available here. |
|||||||||||||||||||||||||
|
|||||||||||||||||||||||||
|
|||||||||||||||||||||||||
Last modified by JT: Mon, 27-May-2002 12:13 |