Fibre Cabling of the first ROD
The Analogue Optohybrids (AOH) were cabled in place on the ROD for the first time on 26 February 2002. This page contains some images of before and after the process. (Click on an image to enlarge it)
Positioning of Optohybrids relative to the structure and description of their fibre labelling is available here.
Before Installation of the AOHs & Fibres
After installation of the AOHs & Fibres
Detail of the cabling of a 4-AOH position
     
Fibre routing through side of ROD frame (a)
Fibre routing through side of ROD frame (b)
Fibre routing around corner of AOH
 
 
 
Gap between AOH fibreclamp and interface PCB
Bowing (up)
Bowing (pushed down)

Last modified by JT: Mon, 27-May-2002 12:13
(return to home)